Pictures From This Week

Pictures from the past few days....


The bridge project also requires a bunch of irrigation repair.  The 6" mainline
that runs under the surface needs to be stabilized against the joists.  This is adding some 
time to the bridge repairs.  We hope to be complete by next Monday or Tuesday

We tackled this ourselves.  The 8" steel pipe converts to 10" pvc
about 10 feet outside the pump house.  We hope to have new pipe in place in the next 10 days.


Alan hauls off the old section of pipe 

This pipe was installed in 1994"ish" Just before Alan (pictured) arrived

Dave and Mike getting things set up to remove the pipe

This is a tricky place to work with the steep slope.  Mike is
a really good operator.  




Pipe cut and removed

Some debris clean up behind 9 green.  Most of what was
cleaned up was already on the ground or dead.


Range mat project is underway with some sod work.
More nasty weather ahead is going to drag this project out I'm afraid.

The bridge is long and is much more involved 
than just resurfacing.  Joists, beams, and irrigation pipe
are all in need this time.

 